Grid Expansion Project West Tyrol – Zell am Ziller

The project West Tyrol – Zell/Ziller forms part of APG’s Network Development Plan and consists of the upgrade of the existing 220 kV transmission line using innovative carbon-core conductors, as well as the installation of an additional 220/380 kV transformer. In particular the deployment of carbon-core conductor technology will make a significant contribution to increasing transmission capacity and strengthening the resilience of the electricity grid.

“Internal Line between West Tyrol – Zell/Ziller (AT)” is designated as a Project of Common Interest (PCI 2.1.3) under the European TEN-E Regulation and forms part of the corridor “North–South Electricity Interconnections in Central Eastern and South-Eastern Europe”, Cluster “Austria – Germany.” As an internal Austrian transmission project, it also makes a significant contribution to further integrating the European electricity market.

Currently, planning, testing and engineering activities are ongoing. The preliminary project phase is expected to be completed in May 2029.

In planning

APG project receives € 1.02 Million in EU Funding

Austrian Power Grid (APG) has secured € 1.0215 million in funding from the European Union’s Connecting Europe Facility (CEF Energy) for its grid expansion project West Tyrol – Zell/Ziller. 

As part of the 2025 CEF Energy call, the European Commission grants approximately € 650 million to 14 cross-border energy infrastructure projects. Among the selected projects is APG’s West Tyrol – Zell/Ziller project, with funding dedicated to planning, testing and engineering activities. 

At a time when demands on the electricity system are increasing rapidly, European funding instruments and EU co-financing play a vital role in accelerating grid expansion and facilitating a secure, affordable, and sustainable energy transition. 

The awarded CEF funding is provided as a grant for studies, covering planning, testing and engineering activities for further development and implementation of the project. 

 

Funded by the European Union. Views and opinions expressed are however those of the author only and do not necessarily reflect those of the European Union. Neither the European Union nor the granting authority can be held responsible for them. 

Contact person

Elisabeth Scheibmeier.jpg

Elisabeth Scheibmeir

Project lead

Wagramer Straße 19 (IZD Tower)
1220 Wien

Phone +43 664 783 574 10 Email Elisabeth.Scheibmeir@apg.at
contact person placeholder

Elisabeth Fazekas

Project communication

Wagramer Straße 19 (IZD-Tower)
1220 Wien

Phone +43664 783 575 46 Email elisabeth.fazekas@apg.at
To the main navigation