Shutdown notifications

According to § 23a para. 1 ElWOG 2010, operators of generating plants with a capacity of more than 20 MW are obliged to notify the control area manager of temporary, temporary seasonal and final shutdowns of their power plant by January 31, 2021.

In Order to inform APG of the planned shutdown, the attached form must be used. The shutdown notification must be sent in Excel format and as a company-signed version to stilllegungsanzeigen@apg.at. APG will confirm the receipt.