Grid Projects

Expansion of the transmission grid and construction projects in the APG control area can have an impact on cross-border capacities.

The current reporting of grid projects with an influence on the NTC > 100 MW takes place in compliance with Regulation (EU) No 543/2013, Article 9.1. However, at the moment there are no plans for applicable long-term infrastructure projects that would begin operations in the next three years (as of November 2017).

Projects that are already in operation and have been disclosed under Regulation (EU) No 714/2009 are made public in the download box on this page (German only).