• Rules on Balancing
  • Frequency Containment Reserve
  • Automatic Frequency Restoration Reserve
  • Manual Frequency Restoration Reserve
  • Procured Balancing Capacity
  • Balancing Energy Bids
  • Frequency
  • Control Area Imbalance
  • Imbalance Prices
  • Financial Expenses and Income
  • Current Market Information (REMIT)
  • Electricity Market
    • Legal
    • Tariffs
    • Allocation
      • Intraday Capacity Allocation
    • Rules regarding nomination of cross-border schedules
  • Balancing
    • Conditions for Participation
    • FCR
      • Tenders
      • Cross-Border Cooperation
      • FAQs
    • aFRR
      • Tenders
      • Cooperation
      • Imbalance Netting Cooperations
      • FAQs
    • mFRR
      • Tenders
      • Cooperation
      • FAQs
    • Unintentional Deviation
    • Statistics
  • Grid Losses
    • Tenders
      • Participation Rules
    • Procurement Concept
      • Long-Term Procurement Process
      • Short-Term Procurement Process
    • FAQs
  • Network Codes
    • Market Integration
      • Capacity Allocation and Congestion Management Guideline (CACM)
      • Forward Capacity Allocation (FCA)
      • Electricity Balancing Guideline (EB)
  • Market Transparency
    • Load
      • Actual Load
      • Load Forecast
      • Capacity Margin
      • Non-available Consumption Units
    • Generation
      • Generation per Type
      • Generation Forecast
      • Installed Power Plant Capacity
      • Non-available Capacities
      • Actual Generation > 100 MW
      • Storage Level
    • Balancing
      • Rules on Balancing
      • Frequency Containment Reserve
      • Automatic Frequency Restoration Reserve
      • Manual Frequency Restoration Reserve
      • Procured Balancing Capacity
      • Balancing Energy Bids
      • Frequency
      • Control Area Imbalance
      • Imbalance Prices
      • Financial Expenses and Income
    • Cross-Border Exchange
      • Unavailabilities (REMIT)
      • NTC Forcasts
      • NTC / ATC
      • Grid Projects
      • Critical Network Elements
      • Schedules
      • Cross-Border Physical Flows
      • EXAA Spot Market Prices
      • Redispatch
      • Congestion Management Cost
      • Allocations
  • Grid Reserve
    • Shutdown notifications
    • Call for interests
    • Offerings
    • FAQ
About APG
Market Information
#futureofenergy
DE
  • Current Market Information (REMIT)
  • Electricity Market
    • Legal
    • Tariffs
    • Allocation
      • Intraday Capacity Allocation
    • Rules regarding nomination of cross-border schedules
  • Balancing
    • Conditions for Participation
    • FCR
      • Tenders
      • Cross-Border Cooperation
      • FAQs
    • aFRR
      • Tenders
      • Cooperation
      • Imbalance Netting Cooperations
      • FAQs
    • mFRR
      • Tenders
      • Cooperation
      • FAQs
    • Unintentional Deviation
    • Statistics
  • Grid Losses
    • Tenders
      • Participation Rules
    • Procurement Concept
      • Long-Term Procurement Process
      • Short-Term Procurement Process
    • FAQs
  • Network Codes
    • Market Integration
      • Capacity Allocation and Congestion Management Guideline (CACM)
      • Forward Capacity Allocation (FCA)
      • Electricity Balancing Guideline (EB)
  • Market Transparency
    • Load
      • Actual Load
      • Load Forecast
      • Capacity Margin
      • Non-available Consumption Units
    • Generation
      • Generation per Type
      • Generation Forecast
      • Installed Power Plant Capacity
      • Non-available Capacities
      • Actual Generation > 100 MW
      • Storage Level
    • Balancing
      • Rules on Balancing
      • Frequency Containment Reserve
      • Automatic Frequency Restoration Reserve
      • Manual Frequency Restoration Reserve
      • Procured Balancing Capacity
      • Balancing Energy Bids
      • Frequency
      • Control Area Imbalance
      • Imbalance Prices
      • Financial Expenses and Income
    • Cross-Border Exchange
      • Unavailabilities (REMIT)
      • NTC Forcasts
      • NTC / ATC
      • Grid Projects
      • Critical Network Elements
      • Schedules
      • Cross-Border Physical Flows
      • EXAA Spot Market Prices
      • Redispatch
      • Congestion Management Cost
      • Allocations
  • Grid Reserve
    • Shutdown notifications
    • Call for interests
    • Offerings
    • FAQ
  • Current Market Information (REMIT)
  • Electricity Market
  • Balancing
  • Grid Losses
  • Network Codes
  • Market Transparency
  • Grid Reserve
  • Legal
    Tariffs
    Allocation
    • Intraday Capacity Allocation
    Rules regarding nomination of cross-border schedules
  • Conditions for Participation
    FCR
    • Tenders
    • Cross-Border Cooperation
    • FAQs
    aFRR
    • Tenders
    • Cooperation
    • Imbalance Netting Cooperations
    • FAQs
    mFRR
    • Tenders
    • Cooperation
    • FAQs
    Unintentional Deviation
    Statistics
  • Tenders
    • Participation Rules
    Procurement Concept
    • Long-Term Procurement Process
    • Short-Term Procurement Process
    FAQs
  • Market Integration
    • Capacity Allocation and Congestion Management Guideline (CACM)
    • Forward Capacity Allocation (FCA)
    • Electricity Balancing Guideline (EB)
  • Balancing
    • Rules on Balancing
    • Frequency Containment Reserve
    • Automatic Frequency Restoration Reserve
    • Manual Frequency Restoration Reserve
    • Procured Balancing Capacity
    • Balancing Energy Bids
    • Frequency
    • Control Area Imbalance
    • Imbalance Prices
    • Financial Expenses and Income
  • Cross-Border Exchange
    • Unavailabilities (REMIT)
    • NTC Forcasts
    • NTC / ATC
    • Grid Projects
    • Critical Network Elements
    • Schedules
    • Cross-Border Physical Flows
    • EXAA Spot Market Prices
    • Redispatch
    • Congestion Management Cost
    • Allocations
  • Generation
    • Generation per Type
    • Generation Forecast
    • Installed Power Plant Capacity
    • Non-available Capacities
    • Actual Generation > 100 MW
    • Storage Level
  • Load
    • Actual Load
    • Load Forecast
    • Capacity Margin
    • Non-available Consumption Units
  • Shutdown notifications
    Call for interests
    Offerings
    FAQ
  • Home
  • Market Information
  • Market Transparency
  • Balancing

  • Current Market Information (REMIT)
  • Electricity Market
    • Legal
    • Tariffs
    • Allocation
    • Rules regarding nomination of cross-border schedules
  • Balancing
    • Conditions for Participation
    • FCR
    • aFRR
    • mFRR
    • Unintentional Deviation
    • Statistics
  • Grid Losses
    • Tenders
    • Procurement Concept
    • FAQs
  • Network Codes
    • Market Integration
  • Market Transparency
    • Load
    • Generation
    • Balancing
      • – Rules on Balancing
      • – Frequency Containment Reserve
      • – Automatic Frequency Restoration Reserve
      • – Manual Frequency Restoration Reserve
      • – Procured Balancing Capacity
      • – Balancing Energy Bids
      • – Frequency
      • – Control Area Imbalance
      • – Imbalance Prices
      • – Financial Expenses and Income
    • Cross-Border Exchange
  • Grid Reserve
    • Shutdown notifications
    • Call for interests
    • Offerings
    • FAQ

Balancing

Information on balancing in the APG control area is outlined in the following points:

  • Rules on balancing
  • Frequency containment reserve (FCR)
  • Automatic frequency restoration reserve (aFRR)
  • Manual frequency restoration reserve (mFRR)
  • Procured Balancing Capacity
  • Balancing Energy Bids
  • Frequency
  • Control area imbalance
  • Imbalance prices
  • Financial expenses and income

 

Further information is displayed on the Pan-European Transparency Platform (EMFIP) of the ENTSO-E.

About us
  • Strategy
  • Organisation
  • Procurement
  • Environment & Future
  • Compliance
  • Power Grid Control
Power Grid
  • APG-Grid
  • High voltage main operation
  • Grid expansion
  • Europe
  • Network Codes
Market Information
  • Current Market Information (REMIT)
  • Electricity Market
  • Balancing
  • Grid Losses
  • Market Transparency
Projects
  • 380-kV-Salzburg Line
  • Upper Austria electric transmission infrastructure
  • APG-Weinviertel Power Line
  • 380-kV Line St. Peter - Federal border
  • ABS4TSO
  • Research Projects
Media-Center
  • Download-Area
  • Press
Jobs
  • Available positions
  • Apprenticeship
  • Praktika
  • Aktuelles
The future of energy
  • Glossary
Austrian Power Grid AG
Wagramer Straße 19 (IZD Tower)
1220 Vienna

Phone: +43 (0) 50320 - 161
E-mail: apg@apg.at
ImpressumDatenschutz