Grid regulation

Tertiary control

If an imbalance in the grid lasts longer than 15 minutes or if the secondary control reserve (aFRR) has been exhausted, the tertiary control reserve – known as the manual frequency restoration reserve (mFRR) – is activated. Tertiary control is used to relieve secondary control and is activated within 10 minutes.