<br>Possible capacity reduction in direction to Slovenia<br>&nbsp;

4/5/2012

Due to a stressed situation in APG grid and expected related uncertainties, critical network situations may occur in May 2012. To secure safe network operation, reductions of the net transfer capacity (NTC) in the direction Austria->Slovenia might be necessary. As a consequence, within this period of time, less capacity could be available in the daily auction process. However, from the current perspective, no concrete implications can be estimated.