<br>Possible capacity reduction in direction to Slovenia<br>&nbsp;

3/8/2012

Due to a stressed situation in APG grid and expected related uncertainties, critical network situations may occur in April 2012. To secure safe network operation, particularly as of mid-April 2012, reductions of the net transfer capacity (NTC) in the direction Austria->Slovenia might be necessary. As a consequence, within this period of time, less capacity could be available in the daily auction process. However, from the current perspective, no concrete implications can be estimated.