APG - Austrian Power Grid
  • deutsch

Search

    • PORTRAIT & MISSION STATEMENT

    • Strategy
    •  
    • HISTORY

    •  
    • ORGANISATION

    • Supervisory Board
    • Company Management
    •  
    • PROCUREMENT

    •  
    •  
    • FACTS & FIGURES

    •  
    • POWER GRID CONTROL

    •  
    •  
    •  
    •  
    • APG-GRID

    •  
    • GRID PLANNING

    •  
    • EUROPEAN GRID ASSOCIATION

    • TSC
    •  
    •  
    • ASSETS

    • Grid System
    • Operating Regions, Operational Management and Fault Management
    • Maintenance
    •  
    • GRID EXPANSION

    • Network development plan 2011
    • Master Plan
    •  
    •  
    •  
    •  
    • ELECTRICITY MARKET

    • Legal
    • Tariffs
    •  
    • BALANCING

    • Conditions for Participation
    • Control Area Imbalance
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Unintentional Deviation
    • Statistics
    •  
    •  
    • CROSS-BORDER EXCHANGE

    • Auctions
    • Available Capacities
    • Intraday Capacities
    • Capacity Reductions
    • Effects of Grid Expansion
    • Schedules
    • Rules regarding Schedules
    • Load Flows
    •  
    •  
    • GENERATION

    • Generation Forecast
    • Non-available Capacities
    • Storage Level
    • Eco-electricity
    • Wind Energy
    • Wind Energy Forecast
    • Installed Power Plant Capacity
    •  
    •  
    • LOAD

    • Load Forecast
    • Capacity Margin
    •  
    • GRID LOSSES

    • Tenders
    • Procurement Concept
    • Frequently asked questions
    •  
    •  
    • 380-KV-SALZBURG LINE

    • Project part 1 (St. Peter - Salzburg)
    • Project part 2 (Salzburg - Tauern)
    •  
    • 380 KV LINE ST. PETER - STAATSGRENZE (SIMBACH)

    •  
    • SOUTHERN BURGENLAND - VIENNA SOUTHEAST 380 KV LINE (BURGENLAND LINE)

    •  
    • 380 KV LINE AT DÜRNROHR - VIENNA SOUTHEAST

    •  
    •  
    •  
    •  
    •  
    • NEWS

    •  
    • PRESS RELEASES

    •  
    • DOWNLOADS

    • Pictures
    • Video
    •  
    • POSITION

    •  
    •  
    •  
    •  
    •  

Effects of Grid Expansion

The power grid expansion and construction measures in the APG control area have an impact on transnational transmission capacities.

The impacts on the NTCs (Net Transfer Capacities), published here, reflect the possible changes from APG’s perspective (status: September 2011). On account of congestions in the neighboring control areas, the bilaterally agreed NTC values may also be lower.

The following are long-term infrastructure projects that will either be commissioned by APG in the course of the next three years or are in the planning stage.

Phase shifting transformer at Lienz substation

Description:

Installation of a 220/220 kV phase shifting in the Lienz substation in order to regulate the power flow on the connecting line between APG and Italy (Lienz – Soverzene) and, hence, guarantee a reliable grid operation without cost intensive congestion management measures.

Status:

Ordered

Anticipated start of operations:

2012

Impacts on NTC:

None expected for 2012; minor increase possible for 2013

Burgenland line: South Burgenland - Vienna Southeast

Description:

The pylons of the Burgenland line, between the South Burgenland substation and the Vienna Southeast substation, were structurally sized for three sub-conductors (bundle of 3) per phase and per system, however, due to the grid configuration and operational  requirements at the time, only two sub-conductors (bundle of 2) were installed. Now, in order to complete the Burgenland line in terms of construction, grid technology and operations, the third sub-conductor is now being installed.

Status:

In progress

Anticipated start of operations:

2012

Impacts on NTC:

None

Zell/Ziller substation

Description:

In Zell/Ziller substation, a second 380/220 kV transformer bank is being installed in order to increase the east-west transmission capacity as well as guarantee the (n-1) safety standard and reserve.

Status:

In progress

Anticipated start of operations:

2012

Impacts on NTC:

None

Ernsthofen – St. Peter

Description:

The existing Ernsthofen – St. Peter line has been constructed as a 380 kV line and is currently being operated with 220 kV. Upgrading to 380 kV operation is envisaged in order to meet the future demands on the APG power grid. The project comprises an expansion in the Ernsthofen und St. Peter substations. The line itself is already designed for 380 kV operations.

Status:

Approved

Anticipated start of operations:

2013

Impacts on NTC:

None (since there is currently no declared congestion to Germany)

Dürnrohr – Sarasdorf

Description:

Deployment of 3rd and 4th circuit on the existing 380 kV line Dürnrohr – Sarasdorf and reconstruction work around the substation Bisamberg
Total length: approx. 100 km

Status:

Approved

Anticipated start of operations:

2014

Impacts on NTC:

None

St. Peter – Staatsgrenze (Simbach)

Description:

The intensely growing energy exchange between Austria and Germany has made an expansion of transmission capacities necessary. The first step planned in this direction is a two-system 380 kV overhead line from grid junction St. Peter to Simbach substation in Germany. In a second expansion project, the connecting line from Tennet TSO GmbH (Germany) to the German grid junction at Ottenhofen will be completed.

Status:

Planned

Anticipated start of operations:

2014 to Simbach, 2017 to Ottenhofen

Impacts on NTC:

None (since there is currently no declared congestion to Germany)

Another large-scale infrastructure project in the APG control area is currently being planned by third parties:

St. Merchant Line Greuth - Tarvisio

Description:

The company Eneco Valcanale S.p.A. is erecting a private connection line between Austria and Italy, which has been conceived as a 132 kV overhead line from Greuth/Arnoldstein to Tarvis. The line is a "merchant line", i.e. not subject to the regulation regime in compliance with EU provision (EG 714/2009).

Status:

Approved

Anticipated start of operations:

2012

Impacts on NTC:

From Austria to Italy:

  • up to 85 additional MW in winter
  • up to 65 additional MW in summer

From Italy to Austria:

  • up to 15 additional MW in winter
  • up to 10 additional MW in summer

(interim status - subject to change)

LINKS

  • Living Grid - ENTSO-E (changes in the grid of continental Europe)
  • APG Master Plan
  • ELECTRICITY MARKET
    • Legal
    • Tariffs
  • BALANCING
    • Conditions for Participation
    • Control Area Imbalance
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Unintentional Deviation
    • Statistics
  • CROSS-BORDER EXCHANGE
    • Auctions
    • Available Capacities
    • Intraday Capacities
    • Capacity Reductions
    • Effects of Grid Expansion
    • Schedules
    • Rules regarding Schedules
    • Load Flows
  • GENERATION
    • Generation Forecast
    • Non-available Capacities
    • Storage Level
    • Eco-electricity
    • Wind Energy
    • Wind Energy Forecast
    • Installed Power Plant Capacity
  • LOAD
    • Load Forecast
    • Capacity Margin
  • GRID LOSSES
    • Tenders
    • Procurement Concept
    • Frequently asked questions

© AUSTRIAN POWER GRID AG, 2012

  • Terms of use