APG - Austrian Power Grid
  • deutsch

Search

    • PORTRAIT & MISSION STATEMENT

    • Strategy
    •  
    • HISTORY

    •  
    • ORGANISATION

    • Supervisory Board
    • Company Management
    •  
    • PROCUREMENT

    •  
    •  
    • FACTS & FIGURES

    •  
    • POWER GRID CONTROL

    •  
    •  
    •  
    •  
    • APG-GRID

    •  
    • GRID PLANNING

    •  
    • EUROPEAN GRID ASSOCIATION

    • TSC
    •  
    •  
    • ASSETS

    • Grid System
    • Operating Regions, Operational Management and Fault Management
    • Maintenance
    •  
    • GRID EXPANSION

    • Network development plan 2011
    • Master Plan
    •  
    •  
    •  
    •  
    • ELECTRICITY MARKET

    • Legal
    • Tariffs
    •  
    • BALANCING

    • Conditions for Participation
    • Control Area Imbalance
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Unintentional Deviation
    • Statistics
    •  
    •  
    • CROSS-BORDER EXCHANGE

    • Auctions
    • Available Capacities
    • Intraday Capacities
    • Capacity Reductions
    • Effects of Grid Expansion
    • Schedules
    • Rules regarding Schedules
    • Load Flows
    •  
    •  
    • GENERATION

    • Generation Forecast
    • Non-available Capacities
    • Storage Level
    • Eco-electricity
    • Wind Energy
    • Wind Energy Forecast
    • Installed Power Plant Capacity
    •  
    •  
    • LOAD

    • Load Forecast
    • Capacity Margin
    •  
    • GRID LOSSES

    • Tenders
    • Procurement Concept
    • Frequently asked questions
    •  
    •  
    • 380-KV-SALZBURG LINE

    • Project part 1 (St. Peter - Salzburg)
    • Project part 2 (Salzburg - Tauern)
    •  
    • 380 KV LINE ST. PETER - STAATSGRENZE (SIMBACH)

    •  
    • SOUTHERN BURGENLAND - VIENNA SOUTHEAST 380 KV LINE (BURGENLAND LINE)

    •  
    • 380 KV LINE AT DÜRNROHR - VIENNA SOUTHEAST

    •  
    •  
    •  
    •  
    •  
    • NEWS

    •  
    • PRESS RELEASES

    •  
    • DOWNLOADS

    • Pictures
    • Video
    •  
    • POSITION

    •  
    •  
    •  
    •  
    •  

Auctions

The cross-border power line connections in the European grid association (Regional Group Continental Europe RGCE, formerly UCTE) are not designed for the transportation of large quantities of electricity. In many cases, the exchange energy demanded by market operators exceeds that of existing transport capacities – this is called a cross-border congestion. A corresponding EU guideline specifies that cross-border line capacities, for which such a congestion is declared, must be made accessible with the market-based procedures of the market operators – as a rule, these transport rights are auctioned. The auctions for each border and direction are done by different offices. See the following two tables: 

Export

From APG Control Area to

Czech Republic

Hungary

Slovenia

Italy

Switzerland

Germany/Vorarlberg

Yearly, monthly and daily auction

Central Allocation Office Freising

 

Capacity Allocating Service Company (CASC.EU) Capacity Allocating Service Company (CASC.EU) No declared congestion

Intraday Capacities

Auction Office CEPS No Intraday Trade ELES No Intraday Trade APG APG

Import

Import into APG Control Area from

Czech Republic

Hungary

Slovenia

Italy

Switzerland

Germany/Vorarlberg

Yearly, monthly and daily auction

Central Allocation Office Freising

 

Capacity Allocating Service Company (CASC.EU) Capacity Allocating Service Company (CASC.EU) No declared congestion

Intraday Capacities

Auction Office CEPS No Intraday Trade ELES No Intraday Trade APG APG

More Information

The amount of auctioned capacity, the auction dates, auction rules and results of the auctions are published on the websites of the given auction offices. Regarding cross-border Intraday trade, please refer to our page Intraday Capacities for more details.

Historical data regarding auctions that took place in Austria from 2003 to 2011 can be downloaded from the box on the right. Further auctions on the borders of the APG control area were conducted by other auction offices. Data pertaining to these actions can be found on the following websites:

  • International Transparency Platform Entsoe.net
  • Auction Office CEPS
  • Auction Office Mavir
  • Auction Office ELES
  • Auction Office Terna
  • Auction Office Swissgrid 

LINKS

  • Auction Rules on the International Transparency Platform Entsoe.net

DOWNLOADS

  • Historic results of yearly auctions in Austria
  • Historic results of monthly auctions in Austria
  • Historic results of daily auctions in Austria
  • ELECTRICITY MARKET
    • Legal
    • Tariffs
  • BALANCING
    • Conditions for Participation
    • Control Area Imbalance
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Unintentional Deviation
    • Statistics
  • CROSS-BORDER EXCHANGE
    • Auctions
    • Available Capacities
    • Intraday Capacities
    • Capacity Reductions
    • Effects of Grid Expansion
    • Schedules
    • Rules regarding Schedules
    • Load Flows
  • GENERATION
    • Generation Forecast
    • Non-available Capacities
    • Storage Level
    • Eco-electricity
    • Wind Energy
    • Wind Energy Forecast
    • Installed Power Plant Capacity
  • LOAD
    • Load Forecast
    • Capacity Margin
  • GRID LOSSES
    • Tenders
    • Procurement Concept
    • Frequently asked questions

© AUSTRIAN POWER GRID AG, 2012