APG - Austrian Power Grid
  • deutsch

Search

    • PORTRAIT & MISSION STATEMENT

    • Strategy
    •  
    • HISTORY

    •  
    • ORGANISATION

    • Supervisory Board
    • Company Management
    •  
    • PROCUREMENT

    •  
    •  
    • FACTS & FIGURES

    •  
    • POWER GRID CONTROL

    •  
    •  
    •  
    •  
    • APG-GRID

    •  
    • GRID PLANNING

    •  
    • EUROPEAN GRID ASSOCIATION

    • TSC
    •  
    •  
    • ASSETS

    • Grid System
    • Operating Regions, Operational Management and Fault Management
    • Maintenance
    •  
    • GRID EXPANSION

    • Network development plan 2011
    • Master Plan
    •  
    •  
    •  
    •  
    • ELECTRICITY MARKET

    • Legal
    • Tariffs
    •  
    • BALANCING

    • Conditions for Participation
    • Control Area Imbalance
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Unintentional Deviation
    • Statistics
    •  
    •  
    • CROSS-BORDER EXCHANGE

    • Auctions
    • Available Capacities
    • Intraday Capacities
    • Capacity Reductions
    • Effects of Grid Expansion
    • Schedules
    • Rules regarding Schedules
    • Load Flows
    •  
    •  
    • GENERATION

    • Generation Forecast
    • Non-available Capacities
    • Storage Level
    • Eco-electricity
    • Wind Energy
    • Wind Energy Forecast
    • Installed Power Plant Capacity
    •  
    •  
    • LOAD

    • Load Forecast
    • Capacity Margin
    •  
    • GRID LOSSES

    • Tenders
    • Procurement Concept
    • Frequently asked questions
    •  
    •  
    • 380-KV-SALZBURG LINE

    • Project part 1 (St. Peter - Salzburg)
    • Project part 2 (Salzburg - Tauern)
    •  
    • 380 KV LINE ST. PETER - STAATSGRENZE (SIMBACH)

    •  
    • SOUTHERN BURGENLAND - VIENNA SOUTHEAST 380 KV LINE (BURGENLAND LINE)

    •  
    • 380 KV LINE AT DÜRNROHR - VIENNA SOUTHEAST

    •  
    •  
    •  
    •  
    •  
    • NEWS

    •  
    • PRESS RELEASES

    •  
    • DOWNLOADS

    • Pictures
    • Video
    •  
    • POSITION

    •  
    •  
    •  
    •  
    •  

Conditions for participation in tenders for control energy

In the APG control area, access to tenders is organised in two steps:

1. Technical prequalification

The technical prequalification is the first step to gain accreditation as a supplier of control energy. Suppliers undergo a technical prequalification to examine whether they meet the technical criteria required to guarantee the necessary quality of the primary, secondary and tertiary control. The prequalification procedure must be carried out separately for each type of control energy. The suppliers are, however, not obliged to prequalify for all three control energy types. They may opt to supply just one or two control energy types (e.g. only tertiary control or primary and secondary control, ...)

The framework conditions are laid down in the Operation Handbook der ENTSO-E, Policy 1. The application for the technical prequalification is carried out with the above-mentioned documents, which must be fully completed by the applicant. This guarantees that the required applicant and power plant data is provided. The application and all documentation must be forwarded by post:

Austrian Power Grid AG
UMM-E/Electricity Procurement
Wagramer Straße 19, IZD-Tower
1220 Wien
AUSTRIA

The prequalification is valid for 3 years and must be renewed in due time. If fulfilment of the individual requirements is confirmed, the validity of the prequalification for the corresponding plants will be extended for a further three years. The supplier will be informed with regard to the extension. In the event of significant changes to the corresponding plants of a supplier, e.g. change in congestion capacity or conversion of the controller, a new prequalification will be required for the plants concerned. If an application for the technical prequalification of further plants is submitted and accepted at a later point in time, these will have the same expiry date as the originally prequalified plants.

On submission of the prequalification documentation, the applicant will be registered as a user on the auction platform. The applicant will subsequently be provided with a user name and access code.

2. Framework Agreement

The second step in gaining accreditation as a supplier involves the conclusion of a Framework Agreement. This agreement, which contains details relating to the legal relationship between the supplier and the control area manager, is identical for all suppliers. The framework agreement itself does not oblige the supplier to supply primary, secondary and tertiary control power within the framework of a tender. When the agreement has been signed by both partners, the supplier will, however, be listed as an accredited supplier and, as of this point in time, has the possibility to participate in all tenders for control energy for the APG control area via the electronic tendering platform. A separate framework agreement must be signed for each type of control energy.

LINKS

to the required documents:

  • Tenders for Primary Control Power
  • Tenders for Secondary Control Power
  • Tenders for Tertiary Control Power

CONTACT

Electricity Procurement

General inquiries relating to the control energy market and control energy offers

  • +43 (0)50320-56477
  • frontoffice.sdl@apg.at

CONTACT

Mr. Dipl.-Ing. Alexander Stimmer

Inquiries relating to prequalification for control energy offers

  • Alexander.Stimmer@apg.at

CONTACT

Ms. Dipl.-Ing. Regina Müller

Inquiries relating to prequalification for control energy offers

  • Regina.Mueller@apg.at
  • ELECTRICITY MARKET
    • Legal
    • Tariffs
  • BALANCING
    • Conditions for Participation
    • Control Area Imbalance
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Unintentional Deviation
    • Statistics
  • CROSS-BORDER EXCHANGE
    • Auctions
    • Available Capacities
    • Intraday Capacities
    • Capacity Reductions
    • Effects of Grid Expansion
    • Schedules
    • Rules regarding Schedules
    • Load Flows
  • GENERATION
    • Generation Forecast
    • Non-available Capacities
    • Storage Level
    • Eco-electricity
    • Wind Energy
    • Wind Energy Forecast
    • Installed Power Plant Capacity
  • LOAD
    • Load Forecast
    • Capacity Margin
  • GRID LOSSES
    • Tenders
    • Procurement Concept
    • Frequently asked questions

© AUSTRIAN POWER GRID AG, 2012

  • Terms of use